Construction is progressing well on the third unit of Ada Yacht Works’ 50-meter 50Z series, referred to as NB103. The hull has been technically launched after being constructed at Norse Shipyard in Kocaeli, Turkey.

It will now be transported to Ada Yacht Works’ facilities in Bodrum for further outfitting. Delivery is anticipated in 2026.

Construction commenced in February 2024.

The yacht is constructed from steel and aluminum, with exterior styling done by Uldas Yacht Design and naval architecture by Ginton Naval Architects. Key specifications include a beam of nine meters and a draft of 2.6 meters.

The interior details remain undisclosed but are designed by the Italian studio Luca Dini. Accommodation is provided across six cabins, including an owner’s suite featuring a private balcony and a Jacuzzi. Additional quarters are available for 10 crew members.

A beach club with a plunge pool, sun loungers, and unfolding hydraulic wings stands out as a design highlight, while the foredeck swimming pool—complete with sunpads—serves as another major social area.

Powered by twin MAN engines, NB103 can achieve a maximum speed of 15 knots and a cruising speed of 12 knots.

According to BOATPro, two other units in the series are currently under construction. The first 50Z is expected to be delivered in June 2025.

Read More/Interior renderings of first 50m ADA 50Z superyacht revealed

Share.
Leave A Reply